OCEB 2 Fund. practice questions: Process Quality, Governance & Metrics

5 free questions from 120 on this area · answer and explanation for each · no sign-up

These 5 questions come from the Process Quality, Governance & Metrics section of our OCEB 2 Fund. bank (120 questions on this area). Every question is original, with the correct answer explained and linked to the source it is drawn from.

Try 6 free OCEB 2 Fundamental questions → All OCEB 2 Fund. sample questions

Free: 6 questions in study mode, no card. All 120 Process Quality, Governance & Metrics questions and the full OCEB 2 Fund. bank: $15 one-time.

1/5 · Process Quality, Governance & Metrics
A BPM team analyzing customer onboarding first documents how the process is currently performed, including manual handoffs between the sales and operations departments and a two-day approval delay. After identifying these issues, the team creates a second model that automates the handoffs and removes the delay. What are these two models called, in order?
ATo-be model, then as-is model
BConceptual model, then physical model
CDiscovery model, then governance model
DAs-is model, then to-be model
Answer: D. Documenting the current, real-world way of working produces an 'as-is' model, which is then used as the basis for designing an improved 'to-be' model. This as-is/to-be pairing is central to process improvement projects. Source: OCEB 2 Fundamental coverage (BPM fundamentals) — Process Quality, Governance & Metrics
2/5 · Process Quality, Governance & Metrics
In the BPM lifecycle, the 'Monitor and Control' stage primarily involves which of the following activities?
ADeploying the process definition to an execution engine for the first time
BSelecting which employees will be trained on the new process
CCreating the initial as-is process model
DMeasuring running process instances against defined metrics/KPIs and detecting deviations from expected performance
Answer: D. The Monitor/Control stage closes the loop between execution and improvement: it tracks actual process performance against defined metrics/KPIs, surfaces variances or exceptions, and provides the data needed for the subsequent Optimize stage. Source: OCEB 2 Fundamental coverage (BPM fundamentals) - Process Quality, Governance & Metrics
3/5 · Process Quality, Governance & Metrics · hard
An invoice-processing instance has a total elapsed cycle time of 10 hours, of which only 2 hours involve activity that directly adds value for the customer (the remainder is queue or wait time). What is the process cycle efficiency (PCE) for this instance?
A200%
B20%
C2 hours
D80%
Answer: B. Process cycle efficiency is calculated as value-added time divided by total cycle time. Here, 2 of the 10 hours are value-added, giving a PCE of 20%, meaning 80% of the elapsed time is non-value-added wait time — a common target for process improvement. Source: OCEB 2 Fundamental coverage (metrics & maturity) — Process Quality, Governance & Metrics
4/5 · Process Quality, Governance & Metrics
What is the primary purpose of value stream mapping within a Lean improvement initiative?
ATo document customer requirements as critical-to-quality characteristics for a project charter
BTo visualize the end-to-end flow of materials and information for a process, distinguishing value-added steps from non-value-added (waste) steps, in order to redesign the flow
CTo calculate a numeric sigma level representing how many defects per million opportunities a process produces
DTo define statistical control limits for a process's key output metric
Answer: B. Value stream mapping is a core Lean tool for seeing the whole flow of a process — including both material and information movement — so that non-value-adding steps can be identified and removed when designing an improved future state. Source: OCEB 2 Fundamental coverage (quality methods) — Process Quality, Governance & Metrics
5/5 · Process Quality, Governance & Metrics
What is the main purpose of process simulation during process design?
ATo predict how a proposed process design will perform — for example cycle time, throughput, resource utilization, and bottlenecks — under varying conditions before it is implemented
BTo provide historical audit trails of completed process instances for compliance reporting
CTo route live customer transactions through the fastest available server
DTo automatically generate executable code for the process engine from a BPMN diagram
Answer: A. Process simulation lets analysts test a proposed design against varying loads and resource assumptions before deployment, revealing bottlenecks or capacity issues while changes are still cheap to make. It is distinct from code generation, historical auditing, and live transaction routing. Source: OCEB 2 Fundamental coverage (BPM technology awareness) — Process Quality, Governance & Metrics
Try 6 more free OCEB 2 Fundamental questions → See the whole OCEB 2 Fund. bank

Other OCEB 2 Fund. areas

The same kind of free sample for every other section of the OCEB 2 Fund. bank:

BPMN 2.0 Basics & Modeling133 qBusiness Motivation Model60 q

Practise OCEB 2 Fund. with instant feedback

6 free questions in study mode · no card · full OCEB 2 Fund. bank with area filters and the error log: $15 one-time · no dumps, no ads.

Start OCEB 2 Fundamental free →
Read next
OCEB 2 vs CBPA: Which Process Certification (BPMN Modelling vs BPM Management) OCEB 2 tests BPMN modelling, CBPA tests the BPM discipline. Fees, format, eligibility and renewal side by side, checked at OMG and ABPMP on 1 Oct 2026.
ExamDeck is an independent study tool, not affiliated with, endorsed by, or sponsored by OMG. OCEB 2 Fund. and related marks are trademarks of their respective owners, used for identification only. Exam facts checked against official OMG materials (as of October 2026); always confirm current details with the vendor before booking.