SAFe SSM practice questions: Introducing Scrum in SAFe

5 free questions from 28 on this area · answer and explanation for each · no sign-up

These 5 questions come from the Introducing Scrum in SAFe section of our SAFe SSM bank (28 questions on this area, which carries 25% of the real exam). Every question is original, with the correct answer explained and linked to the source it is drawn from.

Try 6 free SAFe SSM questions → All SAFe SSM sample questions

Free: 6 questions in study mode, no card. All 28 Introducing Scrum in SAFe questions and the full SAFe SSM bank: $15 one-time.

1/5 · Introducing Scrum in SAFe · easy
Which set of events makes up the Scrum-based cadence for an Agile Team's Iteration in SAFe?
API Planning, System Demo, Inspect and Adapt, Coach Sync, PO Sync, and the Iteration Review.
BSprint Planning, Daily Scrum, Sprint Review, Sprint Retrospective, Backlog Refinement, and PI Planning.
CIteration Planning, Daily Stand-up, Backlog Refinement, Iteration Review, and Iteration Retrospective.
DDaily Stand-up, Iteration Review, Iteration Retrospective, Solution Demo, and Portfolio Sync.
Answer: C. SAFe 6.0 uses the term 'Iteration' (not 'Sprint') and defines its team-level cadence as Iteration Planning, the Daily Stand-up, ongoing Backlog Refinement, the Iteration Review, and the Iteration Retrospective — distinct from ART-level events like PI Planning, System Demo, and Inspect and Adapt. Source: the SAFe 6.0 framework (framework.scaledagile.com) + the official SAFe Scrum Master course content — Introducing Scrum in SAFe
2/5 · Introducing Scrum in SAFe
In SAFe, a shared, agreed-upon 'Definition of Done' that a Story must satisfy before it is considered complete is an application of which practice?
ABuilt-in Quality.
BDevOps.
CPI Planning.
DContinuous Exploration.
Answer: A. Built-in Quality practices, including a shared Definition of Done, ensure every increment meets a consistent, transparent quality bar rather than allowing quality to be compromised under schedule pressure. Source: the SAFe 6.0 framework (framework.scaledagile.com) + the official SAFe Scrum Master course content — Introducing Scrum in SAFe
3/5 · Introducing Scrum in SAFe · hard
Which best explains why SAFe uses Scrum as the foundational team-level framework for Agile Teams within an Agile Release Train?
AScrum is used only because Scrum Master certification is easier to scale than training teams in Kanban, so SAFe standardizes on Scrum to simplify certifying each Agile Team on the train.
BScrum was chosen because its fixed events let the RTE track each team's individual task progress daily, giving the ART centralized control over team-level execution and daily work.
CScrum lets each team choose its own Iteration length and start date, so SAFe can add PI Planning on top of the teams without requiring them to share a common Iteration cadence across the Agile Release Train.
DScrum provides a lightweight, well-defined set of accountabilities, artifacts, and events that give a reliable cadence and empirical process control, on which SAFe layers practices to synchronize teams.
Answer: D. SAFe's Team and Technical Agility competency builds on Scrum because it offers a simple, proven cadence of events, clear accountabilities, and transparent artifacts that enable empirical process control at the team level. SAFe then adds ART-level events and roles, such as PI Planning and the Release Train Engineer, to synchronize multiple Scrum teams delivering a shared Solution. Source: the SAFe 6.0 framework (framework.scaledagile.com) + the official SAFe Scrum Master course content — Introducing Scrum in SAFe
4/5 · Introducing Scrum in SAFe
Which two events combine to form the ART Sync in SAFe?
AIteration Review and Inspect and Adapt.
BThe Coach Sync and the PO Sync.
CTeam Sync and Portfolio Sync.
DThe System Demo and the PO Sync.
Answer: B. In SAFe 6.0, the ART Sync is composed of the Coach Sync, where Scrum Masters/Team Coaches coordinate on dependencies, risks, and impediments, and the PO Sync, where Product Owners align on scope, priorities, and dependencies across teams. Together they keep the ART synchronized between Iterations without requiring every contributor to attend a single large meeting. Source: the SAFe 6.0 framework (framework.scaledagile.com) + the official SAFe Scrum Master course content — Introducing Scrum in SAFe
5/5 · Introducing Scrum in SAFe · hard
On an ART, a Product Owner wants to add a new story to the Team Backlog mid-Iteration at the direct request of a customer, without discussing it with the Developers or checking the current Iteration Goals. As the Scrum Master/Team Coach, which guidance best reflects SAFe Scrum practice?
AThe Scrum Master/Team Coach must formally approve any Team Backlog reprioritization and check it against the current Iteration Goals before the Product Owner communicates it to the Developers.
BThe Product Owner can add the story to the current Iteration directly, since the PO owns Team Backlog content, and the Developers then adjust their plan at the next Team Sync to absorb the new work.
CThe Product Owner may update the Team Backlog at any time, but changes to the current Iteration's scope should be avoided unless necessary and negotiated with the Developers, as they can jeopardize the Iteration Goals.
DThe RTE should review mid-Iteration scope changes for teams on the ART at the next Coach Sync, confirming with the Developers that the current Iteration Goals remain achievable before the new story is added to the team's Iteration.
Answer: C. The Team Backlog is a dynamic artifact that the Product Owner continuously refines and reprioritizes, but the scope committed to during Iteration Planning represents the team's plan for delivering the Iteration Goals. SAFe Scrum practice is that mid-Iteration changes should be minimized and, when necessary, negotiated with the Developers rather than imposed, preserving both team self-management and stakeholder trust. Source: the SAFe 6.0 framework (framework.scaledagile.com) + the official SAFe Scrum Master course content — Introducing Scrum in SAFe
Try 6 more free SAFe SSM questions → See the whole SAFe SSM bank

Other SAFe SSM areas

The same kind of free sample for every other section of the SAFe SSM bank:

Defining the Scrum Master/Team Coach Role30 qSupporting Team Events21 qSupporting ART Events30 q

Practise SAFe SSM with instant feedback

6 free questions in study mode · no card · full SAFe SSM bank with area filters and the error log: $15 one-time · no dumps, no ads.

Start SAFe SSM free →
Read next
SAFe Scrum Master (SSM) vs PSM I: Which Scrum Master Certification for Which Organisation PSM I costs $200 once and never expires. SSM now has a $495 exam-only route and renews at $195 a year. Fees and formats verified at source, 24 Sep 2026. SAFe Certifications Explained: SA vs POPM vs SSM vs RTE (and Who Should Skip SAFe) SA, POPM, SSM and RTE: real exam formats, the pass marks Scaled Agile's own pages disagree on, retake fees and the $195/$295 annual renewal. Checked 18 Sep.
ExamDeck is an independent study tool, not affiliated with, endorsed by, or sponsored by Scaled Agile. SAFe SSM and related marks are trademarks of their respective owners, used for identification only. Exam facts checked against official Scaled Agile materials (as of November 2026); always confirm current details with the vendor before booking.