1/5 · Validating and Managing Requirements · easy
In business analysis practice, what is the primary purpose of requirements validation?
ATo rank requirements in order of importance so that scope can be agreed for the next release
BTo create links between each requirement and the corresponding test cases and design elements
CTo record every requirement change in a single master change log for audit purposes
DTo confirm that documented requirements are correct, complete and consistent, and genuinely reflect the needs of stakeholders before further work proceeds
Show answer & explanation
2/5 · Validating and Managing Requirements
A business analyst needs to trace a single business requirement forward through the more detailed user and system requirements that derive from it, down to the design elements and test cases used to confirm it has been delivered. Which type of traceability does this describe?
AHorizontal traceability
BBackward compatibility checking
CVertical traceability
DBaseline reconciliation
Show answer & explanation
3/5 · Validating and Managing Requirements
A business analyst is embedded in a Scrum team that develops working software in short iterations. Which approach to requirements validation is most consistent with this iterative way of working?
ALeaving all validation of requirements to the independent test team once full system testing has been completed
BProducing one comprehensive requirements document and obtaining formal sign-off from the project board before any development work begins
CAssessing every requirement solely against the CPPOLDAT framework before it is added to the requirements catalogue
DReviewing and confirming requirements continuously with stakeholders, for example through sprint demonstrations of working software or prototypes at the end of each iteration
Show answer & explanation
4/5 · Validating and Managing Requirements
A stakeholder submits a request to change a requirement that has already been baselined. Which sequence of activities correctly reflects a sound change control process?
ARefuse the request outright, since baselining a requirement means it can never be changed again
BAdd the change directly into the requirements catalogue and re-run the full validation exercise on all requirements from the beginning
CUpdate the baseline immediately to keep documentation current, then log the change afterwards for audit purposes
DLog the change request, assess its impact on cost, schedule and other requirements, obtain approval from the appropriate authority, and then update the baseline and related traceability records
Show answer & explanation
5/5 · Validating and Managing Requirements · hard
During a pre-release audit, a business analyst finds that a business requirement recorded in the requirements catalogue has no linked acceptance test case, even though the related user requirements derived from it do have linked test cases. What does this gap most likely indicate, and what should the analyst do first?
AA version control problem; the analyst should roll the requirements baseline back to the previous approved version
BA break in vertical traceability; the analyst should investigate why the chain from the business requirement down to a test case is incomplete, then either establish the missing link or raise it for assessment as a potential change
CA failure of formal validation only; the analyst should have the entire requirements document re-issued for sign-off by the project sponsor
DA break in horizontal traceability; the analyst should immediately submit a change request to delete the business requirement from the catalogue
Show answer & explanation
Other BCS BA Found. areas
The same kind of free sample for every other section of the BCS BA Found. bank:
Study Validating and Managing Requirements with instant feedback
6 free questions · filter study mode by area and difficulty · error log with spaced repetition · no card, no dumps, no ads.
Create your free account →
Read next
ECBA vs CCBA vs CBAP: Which IIBA Certification Fits Your Experience Level? (2026)
ECBA, CCBA or CBAP? The eligibility gate that picks for you, what the 2026 ECBA rewrite changed, and each credential's three-year cost, verified against IIBA.
PMI-PBA vs CBAP: The Business Analysis Certification Decision, Settled with Data
PMI-PBA ($405-555, 36 months of experience) vs CBAP ($495-650 all-in, 7,500 hours plus references): eligibility, exam mechanics, three-year cost, salary data.
ExamDeck is an independent study tool, not affiliated with, endorsed by, or sponsored by BCS. BCS BA Found. and related marks are trademarks of their respective owners, used for identification only. Exam facts checked against official BCS materials (as of August 2026); always confirm current details with the vendor before booking.